WECDF Module Requirement Checklist for OEM Projects
A practical checklist for wavelength, optical power, beam shape, drive mode, thermal path, compliance, and pilot-run planning.
ENGINEERING NOTES
A resource page built with the reference news/list pattern plus supporting modules that route visitors into products and requests.
Use the notes page for emitter selection cases, automotive NIR illumination examples and module requirement guidance. The module structure stays within the same backend components.
A practical checklist for wavelength, optical power, beam shape, drive mode, thermal path, compliance, and pilot-run planning.
A short application case for driver monitoring and occupant sensing teams comparing WECDF NIR illumination choices.
A demo case note on choosing wavelength, beam profile, package, and driver assumptions for a compact ToF depth module.
HOW TO USE THE NOTES
The proof rows connect resource content to products, solution pages and ODM intake.
Use selection notes to narrow wavelength, package and optical-power assumptions.
Review 3D sensing and cabin sensing pages before building a sample plan.
Use the requirement checklist to gather details before submitting a custom request.
Turn the note into an evaluation kit or ODM prototype path.
PRODUCTS MENTIONED IN NOTES
Use product recommendations after reading a selection note or case article.

High-uniformity 940 nm WECDF die for ToF depth cameras, structured-light engines, face authentication, and proximity modules.

WECDF-based NIR illumination and emitter subsystem concept for driver monitoring, occupant detection, and in-cabin sensing.

Custom WECDF driver board and optical subassembly development for OEM sensing modules and pilot production.

WECDF line projector module for triangulation, profile measurement, robot guidance, and short-range industrial sensing. WECDF line projector module for triangulation, profile measurement, robot guidance, and short-range industrial sensing.
RESOURCE FAQ
Quick guidance for engineering and sourcing teams.
Submit a request when the project target is ready.